Please be advised of the following sidewalk construction which will begin mid-September.
There has been a slight change of angle to the new crosswalk on 6th Street at the intersection of 52nd Avenue from what is shown on the drawings. Coalhurst Roads and Sidewalks
Kevin Lewis
Director of Operations
[email protected]
403-381-3033